The S38 Adoption Process

Key Build Stage 3 Road Sub-base

illustration-4
Road sub-base checksEvidence Frequency

Verification including non-frost susceptibility

Tickets

All sources

Check depth of material

Visual

One per 100 tonne

Completed sub-base

Ticket

All sources

Plate Bearing test to assess compaction

Testing

One per 100m (minimum two per site)