The S38 Adoption Process

Key Build Stage 4 Kerbing

illustration-4
Kerbing ChecksEvidenceFrequency
Inspection of kerb/channel races, line, levels and dimensions (kerb race/bed to be laid separate to backing). Visual All lengths
Verification that binder course is laid in two stages if alternative kerbing methods are being utilised. Visual Check in all cases
Inspection of kerb lines and levels. Visual All lengths
Inspection of kerb faces and upstands. Visual All lengths