The S38 Adoption Process

Key Build Stage 5 Road Binder Course

illustration-4
Road binder course checksEvidence Frequency

Verification of materials (check correct binder penetration)

Tickets

All lengths

Check layout of the site in accordance with S38 agreement plan.

Visual

All lengths

Inspection of top of binder course (potential drainage problems)

Visual

All lengths

Cores to assess thickness, compaction and bond

Visual

One per 100m

(minimum three per site)

Rolling Straight Edge tests

Testing

As required